To ensure that the treated water meets the standards for discharge, FPT Da Nang chose Viet An to install an automatic and continuous wastewater monitoring station at the outlet.
FPT Da Nang is a building that serves as a workplace for the staff of the FPT Group. The building is constructed on a total area of 5.9 hectares, with a height of 6 floors. This is the first construction in Vietnam built according to modern architectural standards, featuring a harmonious blend of landscaping and working spaces, similar to what major technology corporations worldwide have implemented. The construction materials used in the project are environmentally friendly and produced using advanced technology.
Phase 1 has a capacity of 3,200 people as part of a strategic project to meet the growth needs of the group in the Central region. Upon completion (expected in 2020), FPT Complex will be able to accommodate 10,000 working individuals.
With such a massive volume of wastewater discharge, FPT Da Nang Urban Development Joint Stock Company has invested in the construction and operation of the Wastewater Treatment Plant in the FPT Da Nang Technology Urban Area, Phase 1, with a capacity of 1,225 m³3/day/night. The system has started receiving wastewater and performing operational tasks to ensure that the treated water meets discharge standards.
To achieve treated water that meets discharge standards, FPT Urban Joint Stock Company in Da Nang, after evaluating capabilities, selected Viet An as the consulting, designing, and equipment supplying unit for the automatic and continuous output wastewater monitoring station..
Viet An monitors the quality of treated wastewater at the outlet to ensure that it meets the national standards. In case of emergency situations where the criteria are not met, the monitoring station promptly sends alerts to the control room through the platform. iLotusLand Platform.
Sincerely thank you for your trust and choosing the environmental monitoring solutions provided by Việt An.